Next month in Ridgefield, an elevated boardwalk is set to begin construction. The biggest chunk of the $3.4 million project will be covered by State Funding through the Local Transportation Capital Improvement Program. It will run from Farmingville Road to South Street. The pedestrian boardwalk will be level with the road and cantilevered about 4-6 feet above the Great Swamp.